Located in the heart of Ohio, Project Astralus is Zuharis's flagship campus: a fully integrated 3 GW gas-powered generation and data center development delivering a minimum of 2.5 GW of IT load capacity. Positioned in one of the most strategically connected corridors in the American Midwest, Project Astralus combines power scale with operational precision.
Phase 1 is on track to be operational in 2027.

Rooted in energy-rich areas, Project Appalachia brings 2 GW of generation capacity and 1 GW of IT load to one of the most compelling power markets in the eastern United States.
A prime location. A significant build.
Details coming soon.